September 22, 2008
Injection works on the A 66
Grund- und Pfahlbau GmbH, as part of a joint venture with GBS, is carrying out comprehensive injection works on the A 66 near Schlüchtern.
The measures were made necessary by a caved area underneath the A 66 which occured during tunnel boring works for the Schlüchtern railway tunnel. In order to get the tunnel boring machine, which . .



| © Bilfinger Berger Ingenieurbau GmbH | Imprint | Data protection information | Last update 06.10.2008 |