HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Anchors and Bracing
Cut-and-Cover Method
Seal Slabs
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerExcavation Pits

Bilfinger Berger designs and constructs turnkey excavation pits to suit the geological, geometrical and local conditions. As needed, these may consist of sloped excavations, sheet pile walls, soldier piles and lagging systems, single/secant/contiguous bored pile walls or diaphragm and cut-off walls with or without inserted steel profiles. If additional support is required, struts, base/intermediate slabs or anchors can be installed. For watertight pits in permeable soils, jetted slabs, concrete seal slabs and injection slabs can be employed.


Europe

Berlin, National Library in Berlin - House 1
Construction Period: 05/2005 - 03/2006
[PDF, 129 KB]
Bratislava, Eurovea International Trade Centre Bratislava GC1-GC2
Construction Period: 07/2006 - 12/2007
[PDF, 83 KB]
Frankfurt/Main, High-rise Building Gallileo
Construction Period: 09/1999 - 09/2000
[PDF, 337 KB]
Frankfurt/Main, Verwaltungsgebäude Lufthansa
Construction Period: 09/2001 - 03/2002
[PDF, 274 KB]
Hamburg, Europa Passage
Construction Period: 08/2003 - 12/2004
[PDF, 416 KB]
Hamburg, Office Building Neuer Wall 37
Construction period: 01/2001 - 12/2002
[PDF, 390 KB]
Lübeck, Herrentunnel, Launching and Retrieval Shaft
Construction period: 10/2001 - 06/2003
[PDF, 201 KB]
Munich, DaimlerChrysler AG
Construction Period: 06/2000 - 03/2001
[PDF, 671 KB]
Paris, Syctom - Isseane
Construction Period: 09/2003 - 05/2004
[PDF, 178 KB]
Trondheim, E6 Tunnel Skansenloepet
Construction Period: 06/2006 - 08/2008
[PDF, 225 KB]
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger AG | Imprint | Data protection information | Last update 02.07.2008