HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Anchors and Bracing
Cut-and-Cover Method
Seal Slabs
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerAnchors and Bracing

Anchors can be used to tie-back retaining walls wherever adjacent ground or legal conditions allow the placement of temporary or permanent structures outside the actual excavation pit. They can be used as single rod element or multi strand systems with standard length of 15-20 m up to exceptional 50 m long element. Bracing is a cost efficient alternative when distances between wall elements and loads are relatively small and can be supported by standard steel profiles. Retaining walls can receive multiple bracing layers, placed from side to side or within the excavation.


Europe

Amsterdam, Jet Grouted Slab Ceintuurbaan
Construction Period: 07/2005 - 02/2006
[PDF, 330 KB]
Amsterdam, Jet Grouted Slab ROKIN I
Construction Period: 07/2005 - 02/2006, 04/2007 - 09/2007
[PDF, 234 KB]
Berlin, City-Light-House
Construction Period: 03/2002 - 10/2003
[PDF, 156 KB]
Berlin, Hotel Holiday Inn
Construction Period: 03/2002 - 10/2002
[PDF, 277 KB]
Berlin, National Library in Berlin - House 1
Construction Period: 05/2005 - 03/2006
[PDF, 129 KB]
Brixlegg, H2-1, Tunnel Brixlegg
Construction Period: 07/2004 - 05/2006
[PDF, 520 KB]
Denkendorf, High Speed Line Nuremberg-Ingolstadt Lot South
Construction Period: 09/2001 - 07/2004
[PDF, 409 KB]
Frankfurt/Main, Verwaltungsgebäude Lufthansa
Construction Period: 09/2001 - 03/2002
[PDF, 274 KB]
Frankfurt/Main, WestendDuo - Building Pit
Construction Period: 07/2004 - 01/2005
[PDF, 471 KB]
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger Ingenieurbau GmbH | Imprint | Data protection information | Last update 20.08.2008