HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Anchors and Bracing
Cut-and-Cover Method
Seal Slabs
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerSeal Slabs

To construct a watertight excavation pit in conditions where the final excavation level is well below the water table, a watertight concrete seal slab is required in addition to watertight retaining walls, if the water table outside the pit cannot be lowered. If no impermeable soil layer (for example clay) exists at the embedment level of the retaining wall, seal slabs can be made from tremie concrete, jet grouting or using various injection methods. Vertical Ground Anchors will reduce the need for buoyancy control by dead weight.


Europe

Berlin, Baugrube Operncarree
Construction Period: 03/2004 - 08/2004
[PDF, 411 KB]
Berlin, City-Light-House
Construction Period: 03/2002 - 10/2003
[PDF, 156 KB]
Berlin, Hotel Holiday Inn
Construction Period: 03/2002 - 10/2002
[PDF, 277 KB]
Berlin, National Library in Berlin - House 1
Berlin, National Library in Berlin - House 1
[PDF, 129 KB]
Berlin, Office Building Salzufer
Construction period: 01/2001 - 12/2002
[PDF, 275 KB]
Berlin, Tunnel Shafts Ernst-Ruska-Ufer
Construction Period: 11/2002 - 02/2003
[PDF, 382 KB]
Brixlegg, H2-1, Tunnel Brixlegg
Construction Period: 07/2004 - 05/2006
[PDF, 504 KB]
Potsdam, Hans-Otto-Theater
Construction Period: 03/2003 - 10/2003
[PDF, 84 KB]
Trondheim, E6 Tunnel Skansenloepet
Construction Period: 06/2006 - 08/2008
[PDF, 225 KB]
Weinheim, Waste Water treatment Plant
Construction Period: 08/2002 - 10/2002
[PDF, 117 KB]
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger Ingenieurbau GmbH | Imprint | Data protection information | Last update 20.08.2008