HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Bilfinger Berger
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Europe
International
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerMonitoring and Testing

International

Large and complex construction projects have to be carried out cost effectively, fast and with the least possible risk. Our construction monitoring services can support these goals using automated procedures that indicate interruptions or disturbances at a very early stage. Recent developments in the IT and sensor sector have resulted in powerful monitoring systems that are flexible, can deal with large data volumes, and have simplified field operations. Following applications are performed by us as a daily routine:

  • RAMPOS (Automated Positioning Control for Driven and Bored Works)
  • HYDROPHONE Measurements (Determination of Jet-Grouting Range)
  • KIKS (3-D Bore-Hole and Slurry-Wall-Panel Survey during drilling)
  • NDT Methods (CSL, Koden Testing, Impact Echo, Parallel Seismic)
  • Deformation Measurements (Inclinometer, Extensometer, Dilatometer)
  • Automated Data Collection and Monitoring (Anchor Testing, Deformation)
  • GPS Survey

Bilfinger Berger's material testing branch supports us in the process of selection and design of construction material. Our own soil laboratory facilities enable us to handle all stages of complex projects from soil investigation via design parameter verification to field quality control. Our in-house facilities can perform most soil parameter tests.

Bangkok, Second Stage Highway, Bored Piles
Construction Period: 07/1990 - 06/2000
[PDF, 198 KB]
Bangkok, Second Stage Highway, Driven Piles
Construction Period: 07/1990 - 06/2000
[PDF, 316 KB]
Marmet, Marmet Locks and Dam Replacement
Construction Period: 03/2004 - 05/2004
[PDF, 53 KB]
Panama, Puente Centenario
Construction Period: 04/2002 - 09/2002
[PDF, 185 KB]
Taichung, Taiwan High Speed Rail, Bored Piles
Construction Period: 04/2000 – 06/2004
[PDF, 249 KB]
Vancouver, Golden Ears Bridge Mono-Piles
Construction Period: 09/2006 - 12/2007
[PDF, 746 KB]
Vancouver, Golden Ears Bridge - River Piles
Construction Period: 09/2006 - 04/2007
[PDF, 321 KB]
Vinh Long, My Thuan Bridge
Construction Period: 11/1997 - 08/1998
[PDF, 282 KB]