HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Soldier Pile and Lagging
Bored Pile Wall (Single, Contiguous, Secant)
Diaphragm Wall
Sheet Pile Wall
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerSoldier Pile and Lagging

These are vertical columns (mostly steel H-beams) spaced at 2-3 m intervals with horizontal lagging from timber boards or concrete. The wide range of possible applications and the adaptability to local site conditions have resulted in a large number of different combinations employing various materials. To keep noise and vibrations to a minimum, or where driving is not allowed, columns may also be placed into pre-excavated boreholes.
Cologne, Joint Venture Rheinpark Cologne
Construction Period: 02/2006 - 09/2006
[PDF, 520 KB]
Denkendorf, High Speed Line Nuremberg-Ingolstadt Lot South
Construction Period: 09/2001 - 07/2004
[PDF, 409 KB]
Dresden, State Library of Saxony
Construction Period: 10/1998 - 05/1999
[PDF, 84 KB]
Frankfurt/ Main, Verwaltungsgebäude Lufthansa
Construction Period: 09/2001 - 03/2002
[PDF, 274 KB]
Kulmbach, Underpinning Kohlenbach
Construction Period: 09/2003 - 04/2004
[PDF, 584 KB]
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS