HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Soldier Pile and Lagging
Bored Pile Wall (Single, Contiguous, Secant)
Diaphragm Wall
Sheet Pile Wall
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerBored Pile Wall (Single, Contiguous, Secant)

Bored pile walls are vertical bored piles, acting either as single piles, contiguous (only touching each other) or a secant pile wall with overlapping piles. Piles are mostly installed as cased piles with typical diameters ranging from 60 to 120 cm. When installations have limited clearance, prohibiting the use of standard drilling equipment, special equipment can be used to a degree where it almost undercuts an existing structure.
Bad Salzdetfurth, Retaining Walls
Construction Period: 11/1995 - 10/1997
[PDF, 62 KB]
Belfast, M1 Westlink
Construction Period: 05/2006 - 10/2007
[PDF, 591 KB]
Berlin, National Library in Berlin - House 1
Construction Period: 05/2005 -03/2006
[PDF, 129 KB]
Brixlegg, H2-1 Tunnel Brixlegg
Construction Period: 07/2004 - 05/2006
[PDF, 520 KB]
Cologne, Joint Venture Rheinpark Cologne
Construction Period: 02/2006 - 09/2006
[PDF, 520 KB]
Denkendorf, High Speed Line Nuremberg-Ingolstadt Lot South
Construction Period: 09/2001 - 07/2004
[PDF, 409 KB]
Denkendorf, Tunnel Denkendorf
Construction Period: 10/2001 - 10/2003
[PDF, 548 KB]
Frankfurt/Main, High-rise Building Gallileo
Construction Period: 09/1999 - 09/2000
[PDF, 337 KB]
Frankfurt/ Main, WestendDuo - Building Pit
Construction Period: 07/2004 - 01/2005
[PDF, 471 KB]
Hamburg, Airport City-Rail Motorway Section 5-8
Construction Period: 10/2005 - 01/2006
[PDF, 692 KB]
Kulmbach, Underpinning Kohlenbach
Construction Period: 09/2003 - 04/2004
[PDF, 584 KB]
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger Ingenieurbau GmbH | Imprint | Data protection information | Last update 20.08.2008