Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerStorm Water Protection

For storm water protection, we install sheet piles into cut-off walls to construct watertight elements with minimal disturbance to the natural surrounding ground. We can also install vibrated cut-off walls to enhance the stability of existing dikes. All these structures can be combined with mobile storm water protection elements.


Europe

Dömitz, Flood Water Protection Dömitz
Construction Period: 08/2004 - 11/2004
[PDF, 183 KB]
Emmerich, Dyke-Rehabilitation Emmerich Lot 6
Construction Period: 04/2004 - 05/2005
[PDF, 211 KB]
Frankfurt/Main, Theodor-Stern-Kai
Construction Period: 06/2002 - 12/2003
[PDF, 537 KB]
Hamburg, Excavation Pit Brooktorkai
Construction Period: 05/2007 - 09/2008
[PDF, 278 KB]
Kollau, Flood protection dike
Construction Period: 11/2006 - 05/2007
[PDF, 957 KB]
Magdeburg, Renovation of the bank edging of the river Elbe
Construction Period: 12/2005 - 03/2007
[PDF, 773 KB]
Monheim, Cut-Off Wall Monheim
Construction Period: 01/2000 - 12/2000
[PDF, 473 KB]