HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Europe
International
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerDeep Foundations

Europe

In the field of deep foundations, Bilfinger Berger Foundation Engineering offers a wide range of ground engineering techniques employing company-owned equipment and skilled personnel.

We can install all types of piles, from driven to bored, vibrated or pressed. We have delivered piles with diameters up to 2.5 meters and depths exceeding 100 meters.

Panels or baretts, whether as single or cross elements, can also be utilized as deep foundation elements.

For much higher foundation loads, caisson design and construction for offshore applications are also available.

We also regularly install pile-raft foundations which are required in situations where high loading such as occurs in high rise buildings has to be placed on settlement sensitive soils.

Deep shafts from secant diaphragm panels are frequently used for situations where deep excavations (tunnel starts/retrieval chambers) are required.

Cologne, Joint Venture Rheinpark Cologne
Construction Period: 02/2006 - 09/2006
[PDF, 520 KB]
Copenhagen, Noise Protection Wall Lot E 32
Construction Period: 05/2005 - 07/2008
[PDF, 235 KB]
Frankfurt/Main, Maintower
Construction Period: 08/1996 - 06/1997
[PDF, 465 KB]
Frankfurt/Main, Commerzbank Tower
Construction Period: 06/1994 - 06/1995
[PDF, 225 KB]
Frankfurt/Main, High-rise Building Galileo
Construction Period: 09/1999 - 09/2000
[PDF, 337 KB]
Göteborg, Lilla Bommen Tunnel
Construction Period: 11/2002 - 03/2003
[PDF, 178 KB]
Hamburg, Airport City-Rail Motorway Section 5-8
Construction Period: 10/2005 - 01/2006
[PDF, 692 KB]
Hamburg, Europa Passage
Construction Period: 08/2003 - 12/2004
[PDF, 416 KB]
Le Havre, Pont de Normandie
Construction Period: 09/1990 - 08/1992
[PDF, 59 KB]
Offenbau, NBS Nürnberg - Ingolstadt
Construction Period: 03/2000 - 08/2004
[PDF, 553 KB]
Paris, Syctom
Construction Period: 09/2003 - 05/2004
[PDF, 178 KB]
Sarpsborg, Ny Sandesund Bridge
Construction Period: 07/2006 - 09/2006
[PDF, 584 KB]
Vienna, Schmerlingplatz
Construction Period: 07/2004 - 10/2005
[PDF, 510 KB]

 

International
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger Ingenieurbau GmbH | Imprint | Data protection information | Last update 06.10.2008