HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Bilfinger Berger
Deep Foundations
Europe
International
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerDeep Foundations

International

In the field of deep foundations, Bilfinger Berger Foundation Engineering offers a wide range of ground engineering techniques employing company-owned equipment and skilled personnel.

We can install all types of piles, from driven to bored, vibrated or pressed. We have delivered piles with diameters up to 2.5 meters and depths exceeding 100 meters.

Panels or baretts, whether as single or cross elements, can also be utilized as deep foundation elements.

For much higher foundation loads, caisson design and construction for offshore applications are also available.

We also regularly install pile-raft foundations which are required in situations where high loading such as occurs in high rise buildings has to be placed on settlement sensitive soils.

Deep shafts from secant diaphragm panels are frequently used for situations where deep excavations (tunnel starts/retrieval chambers) are required.

Bangkok, Bang Na Expressway, Bored Piles
Construction Period: 01/1997 - 07/1999
[PDF, 104 KB]
Bangkok, Bang Na Expressway, Driven Piles
Construction Period: 01/1997 - 07/1999
[PDF, 91 KB]
Bangkok, Second Stage Highway, Bored Piles
Construction Period: 07/1990 - 06/2000
[PDF, 198 KB]
Bangkok, Second Stage Highway, Driven Piles
Construction Period: 07/1990 - 06/2000
[PDF, 316 KB]
La Réunion, Routes des Tamarins, Viaduc St. Paul
Construction Period: 03/2006 - 06/2007
[PDF, 1827 KB]
Marmet, west Virginia, Marmet Locks
Construction Period: 03/2004 - 05/2004
[PDF, 53 KB]
North Dakota, Four Bears Bridge
Construction Period: 10/2003 - 11/2003 + 04/2004 - 11/2004
[PDF, 423 KB]
Panama, Puente Centenario
Construction Period: 04/2002 - 09/2002
[PDF, 185 KB]
Taichung, Taiwan High Speed Rail
Construction Period: 04/2000 - 06/2004
[PDF, 249 KB]
Toledo, Maumee River Bridge
Construction Period: 04/2002 - 09/2003
[PDF, 346 KB]
Vancouver, Golden Ears Bridge Mono-Piles
Construction Period: 09/2006 - 12/2007
[PDF, 746 KB]
Vancouver, Golden Ears Bridge - River Piles
Construction Period: 09/2006 - 04/2007
[PDF, 321 KB]
Vinh Long, My Thuan Bridge
Construction Period: 11/1997 - 08/1998
[PDF, 282 KB]
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger Ingenieurbau GmbH | Imprint | Data protection information | Last update 13.11.2008