Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Europe
International
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerDiaphragm Walls

Europe

Diaphragm walls are frequently used as retaining walls in urban areas or for securing deep excavations. Single rectangular panels are excavated and backfilled with reinforcement cages and/or concrete. Any shape of wall can be constructed by combining primary and secondary panels. The method's structural advantages of walls thicker than 2 m, in combination with installation methods that allow an almost watertight construction, serve to integrate the wall into the final building. Heavy loads can easily be transferred into deeper soil layers, since walls can be up to 50 m deep. Combinations with embedded reinforcement cages and single steel beams can provide a high lateral load bearing capacity. Diaphragm walls can also act as cut-off walls when penetrating deep into an impermeable soil layer. When placed as a single panel or cross panel, they provide a structural element with high vertical load bearing capacity.
Berlin, Baugrube Operncarree
Construction Period: 03/2004 - 08/2004
[PDF, 411 KB]
Berlin, City-House-Light
Construction Period: 03/2002 - 10/2003
[PDF, 156 KB]
Berlin, Tunnel Shafts Ernst-Ruska-Ufer
Construction Period: 11/2002 - 02/2003
[PDF, 382 KB]
Bielefeld, Sludge Dump Bielefeld
Construction Period: 02/1990 - 12/1990
[PDF, 126 KB]
Bratislava, Eurovea International Trade Centre Bratislava GC1-GC2
Construction Period: 07/2006 - 12/2007
[PDF, 83 KB]
Carcassonne, Enclosure of the Building Pit Underground Car Park Parking Square Gambetta
Construction Period: 06/2006 - 12/2006
[PDF, 246 KB]
Hamburg, Airport City-Rail Motorway Section 5-8
Construction Period: 10/2005 - 01/2006
[PDF, 692 KB]
Hamburg, Europa Passage
Construction Period: 08/2003 - 12/2004
[PDF, 416 KB]
Hamburg, Office Building Neuer Wall 37
Construction period: 01/2001 - 12/2002
[PDF, 390 KB]
Hamburg, Sielsicherung Sternschanze
Construction Period: 10/2002 - 12/2002
[PDF, 315 KB]
Lübeck, Herrentunnel, Launching and Retrival Shaft
Construction period: 10/2001 - 06/2003
[PDF, 201 KB]
Paris, Syctom - Isseane
Construction Period: 09/2003 - 05/2004
[PDF, 178 KB]
Toulouse, Subway Toulouse
Construction Period: 07/2002 - 03/2003
[PDF, 331 KB]
Vienna, Joint Venture U1/1 Kagraner Platz
Construction Period:09/2001 - 05/2003
[PDF, 225 KB]
Vienna, Subway Section U2/5
Construction Period: 02/2003 - 09/2004
[PDF, 543 KB]

 