HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Europe
International
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerJet Grouting

Europe

Jet grouting is an in-situ mix of natural soils with a stabilizing mixture. Generally, a mixture of cement, water and occasionally air will be injected at very high pressure (between 200 and 400 bar) through a drilling rod nozzle with a small diameter. As the grout is injected at high velocity, the jet grouting process destroys the natural soil matrix to create a mix of the stabilizer and the in-situ soils. The result is a homogeneous and continuous structural element with predetermined shape and mechanical characteristics. Most notably, the soil’s compressive strength and elasticity modulus increases, while its permeability simultaneously decreases. Jet grouting can be applied to a wide range of soils from non-cohesive, poorly graded granular soils to cohesive plastic clays.

Amsterdam, Jet Grouted Slab Ceintuurbaan
Construction Period: 07/2005 - 02/2006
[PDF, 330 KB]
Amsterdam, Jet Grouted Slab ROKIN I
Construction Period: 07/2005 - 02/2006, 04/2007 - 09/2007
[PDF, 234 KB]
Berlin, Baugrube Operncarree
Construction Period: 03/2004 - 08/2004
[PDF, 411 KB]
Berlin, Office Building Salzufer
Construction Period: 04/2002 - 08/2002
[PDF, 275 KB]
Berlin, City-Light-House
Construction Period: 03/2002 - 08/2003
[PDF, 156 KB]
Duisburg, HDI Hüttenwerke Krupp Mannesmann
Construction Period: 12/1999 - 01/2000
[PDF, 106 KB]
Eisenach, Building Rehabilitation Wandelhalle
Construction Period: 07/2004 - 08/2004
[PDF, 49 KB]
Frankfurt/Main, Verwaltungsgebäude Lufthansa
Construction Period: 09/2001 - 03/2002
[PDF, 274 KB]
Kulmbach, Underpinning Kohlenbach
Construction Period: 09/2003 - 04/2004
[PDF, 584 KB]
Moritzburg, Rehabilitation Castle Moritzburg
Construction Period: 06/2003 - 09/2003
[PDF, 170 KB]
Munich, Sanierung Freibank
Construction Period: 04/2004 - 11/2004
[PDF, 628 KB]
Paris, Syctom - Isseane
Construction Period: 09/2003 - 05/2004
[PDF, 178 KB]
Vienna, Underground Parking Garage Schmerlingplatz
Construction Period: 07/2004 - 10/2005
[PDF, 510 KB]

 

International
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger AG | Imprint | Data protection information | Last update 02.07.2008