HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Europe
International
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerGround Improvement

Europe

Soft or loose ground cannot support high loads without preliminary treatment.

To improve ground stability and reduce settlements, we employ various methods of soil improvement including soil replacement, vertical drains, dynamic compaction, deep compaction, injections or high pressure jet grouting.

These methods improve soils of low load bearing capacities to such a degree that they can be built on without any additional measures.

Cologne, Compensation Injections North-South City-Rail
Construction Period: 06/2005 - 03/2008
[PDF, 145 KB]
Fessenheim. Lock Fessenheim, Injection Works
Construction Period: 10/2003 - 11/2003
[PDF, 608 KB]
Leipzig, Leipzig - Mockau, Jet Grouting
Construction Period: 10/1997 - 03/1998
[PDF, 231 KB]
Strasbourg, Nouvel Hopital Civil
Construction Period: 10/2002 - 01/2003
[PDF, 295 KB]
Weinheim, Waste Water Treatment Plant
Construction Period: 08/2002 - 10/2002
[PDF, 117 KB]
Vienna, Joint Venture U1/1 Kagraner Platz
Construction Period: 09/2001 - 05/2003
[PDF, 225 KB]

 

International
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger AG | Imprint | Data protection information | Last update 02.07.2008