HomeKonzernSitemapContact
Bilfinger Berger Logo
PROFILE
SERVICES
TECHNIQUES
LOCATIONS
CIVIL
NEWS
Bilfinger Berger
Deep Foundations
Bored Piles (Drilled Shafts, Cast In-Situ Piles)
Europe
International
Driven Piles
Retaining Walls (Shoring)
Underpinning
Diaphragm Walls
Slurry and Cut-Off Walls
Jet Grouting
Excavation Pits
Ground Freezing
Ground Improvement
Landfill Construction and Rehabilitation
Storm Water Protection
Monitoring and Testing
Engineering and Consultant Services
Special Foundation Techniques

Bilfinger BergerBored Piles (Drilled Shafts, Cast In-Situ Piles)

International

The large number of pile systems currently available on the market reflects the significance of pile foundations. Bored piles can be either used as single foundation piles (on/offshore), pile groups, inclined piles, or in various combinations for retaining walls. In general, bored piles can be installed in a variety of soils including very soft clays, dense sands and hard rock. Various drilling techniques and excavation tools are employed as needed.Bilfinger Berger offers the following methods to excavate piles of various diameters depending on the soil conditions:
  • Rotary Drilling Method
  • Drive-Drill Excavation Method (Grab + Chisel)
  • Reversed Circulation Method (RCD)
  • Airlifting Method (and combinations with RCD)
  • Flush drilling Method (for smaller diameter)
  • Down-the-Hole-Hammer Drilling Method
  • Blasting Methods
If required, we own equipment to install steel casings using the following methods:
  • Driving (Drop Weight and Hammers)
  • Vibrating (Vibro-hammers)
  • Oscillating (VRM)
  • Rotating (RDM)
  • Pneumatic Installation (Hochstrasser-Weise Method)
If casings are not required, or cannot be used, we can stabilize the borehole with water, bentonite or polymer. If the surrounding soils are stable enough, the continuous flight auger method can be used for drilling without any support. We also offer energy pile installation. These piles combine a load bearing capacity with the ability to retrieve thermal energy from the surrounding ground. Pile test methods like static, dynamic or even the O-cell test method are among our standard practices. We have performed several vertical compression pile tests up to 50 MN.
Bangkok, Bang Na Expressway
Construction Period: 01/1997 - 07/1999
[PDF, 104 KB]
Bangkok, Second Stage Highway
Construction Period: 07/1990 - 06/2000
[PDF, 198 KB]
Marmet, West Virginia, Marmet Locks
Construction Period: 03/2004 - 05/2004
[PDF, 53 KB]
Panama, Puente Centenario
Construction Period: 04/2002 - 09/2002
[PDF, 185 KB]
Taichung, Taiwan High Speed Rail
Construction Period: 04/2000 - 06/2004
[PDF, 249 KB]
Toledo, Maumee River Crossing
Construction Period: 04/2002 - 09/2003
[PDF, 346 KB]
Vancouver, Golden Ears Bridge Mono-Piles
Construction Period: 09/2006 - 12/2007
[PDF, 746 KB]
Vancouver, Golden Ears Bridge - River Piles
Construvtion Period: 09/2006 - 04/2007
[PDF, 321 KB]
Vinh Long, My Thuan Bridge
Construction Period: 11/1997 - 08/1998
[PDF, 282 KB]
backSend linkprint
 
up
PROFILE  |  SERVICES  |  TECHNIQUES  |  LOCATIONS  |  CIVIL  |  NEWS
© Bilfinger Berger Spezialtiefbau GmbH | Imprint | Data protection information | Last update 12.07.2010